Material/Processed materials

From AdCiv
< Material
Revision as of 17:02, 7 June 2021 by Balatro (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Figures per kilogram of metal

  • Steel 60 megajoules (16.6 kilowatt hours)
  • Aluminium 320
  • Copper 116

Should state from what ore

Cost from mining (can be greatly reduced by biomining in some cases, maybe all)

Find good reference. (Temp [1])